Document Type : Research Paper

Authors

1 Department of Industrial Engineering, Universitas Bunda Mulia, Jakarta-14430, Indonesia.

2 Department of Management, Universitas Pembangunan Jaya, Banten, Indonesia.

Abstract

In the manufacturing process, the machine is very important because downtime can inhibit and even stop production. We focused on the highest downtime that occurred in a particular product line and critical machine. This research contributes to overcoming and making the machine's performance and ability better. We make use the Total Productive Maintenance (TPM), which started by calculating Overall Equipment Effectiveness (OEE) and Six Big Losses. This study also provides the maintenance attempt to increase the effectiveness and to eliminate losses incurred by calculating Mean Time Between Failure (MTBF) and Mean Time To Repair (MTTR). Finally, we proposed the TPM implementation to improve the effectiveness of the machine. The result showed that the OEE has not reached the ideal value due to the low availability. Breakdown losses contributed to the biggest factor in the loss. The way to overcome the cause of breakdown losses is to increase performance maintenance, by calculating and evaluating MTBF and MTTR. This research presented the cause of the low value of OEE, provided the performance maintenance policy according to MTBF and MTTR, and proposed the TPM implementation.

Keywords

[1] Chong, K. E., & Ng, K. C. (2016, December). Relationship between overall equipment effectiveness, throughput and production part cost in semiconductor manufacturing industry. In 2016 IEEE international conference on industrial engineering and engineering management (IEEM) (pp. 75-79). IEEE.
[2] Liao, D. Y., Tsai, W. P., Chen, H. T., Ting, Y. P., Chen, C. Y., Chen, H. C., & Chang, S. C. (2018, September). Recurrent Reinforcement Learning for Predictive Overall Equipment Effectiveness. In 2018 e-manufacturing & design collaboration symposium (eMDC) (pp. 1-4). IEEE.
[3] Rasheed, R., & Rasheed, S. (2016). Advancement of Overall Equipment Effectiveness (OEE) IN Machining Process Industry. International Journal for research in electronics & electrical engineering (ISSN: 2208-2735)2(8), 01-14.
[4] Saleem, F., Nisar, S., Khan, M. A., Khan, S. Z., & Sheikh, M. A. (2017). Overall equipment effectiveness of tyre curing press: a case study. Journal of quality in maintenance engineering23(1), 39-56.
[5] Tannady, H., Gunawan, E., Nurprihatin, F., & Wilujeng, F. R. (2019). Process improvement to reduce waste in the biggest instant noodle manufacturing company in South East Asia. Journal of applied engineering science17(2), 203-212.
[6] Prinz, C., Kreimeier, D., & Kuhlenkötter, B. (2017). Implementation of a learning environment for an Industrie 4.0 assistance system to improve the overall equipment effectiveness. Procedia manufacturing9, 159-166.
[7] Prinz, C., Kreimeier, D., & Kuhlenkötter, B. (2017). Implementation of a learning environment for an Industrie 4.0 assistance system to improve the overall equipment effectiveness. Procedia manufacturing9, 159-166.
[8] Wudhikarn, R. (2016). Implementation of the overall equipment cost loss (OECL) methodology for comparison with overall equipment effectiveness (OEE). Journal of quality in maintenance engineering22(1), 81-93.
[9] Shah, M. K., Deshpande, V. A., & Patil, R. M. (2017, February). Case study: Application of Lean tools for Improving Overall Equipment Effectiveness (OEE) & Productivity in panel shop of heavy Fabrication Industry. Proceedings of 2nd international conference on emerging trends in mechanical engineering.
[10]  Binti Aminuddin, N. A., Garza-Reyes, J. A., Kumar, V., Antony, J., & Rocha-Lona, L. (2016). An analysis of managerial factors affecting the implementation and use of overall equipment effectiveness. International journal of production research54(15), 4430-4447.
[11]  Soltanali, H., Rohani, A., Tabasizadeh, M., Abbaspour-Fard, M. H., & Parida, A. (2018). Improving the performance measurement using overall equipment effectiveness in an automotive industry. International journal of automotive engineering8.
[12]  Paprocka, I., Kempa, W., Kalinowski, K., & Grabowik, C. (2015). Estimation of overall equipment effectiveness using simulation programme. IOP conference series: materials science and engineering (Vol. 95, No. 1, p. 012155). IOP Publishing.
[13]  Tsarouhas, P. (2019). Improving operation of the croissant production line through overall equipment effectiveness (OEE) A case study. International journal of productivity and performance management68(1), 88-108.
[14]  Sari, M. F., & Darestani, S. A. (2019). Fuzzy overall equipment effectiveness and line performance measurement using artificial neural network. Journal of quality in maintenance engineering.
[15]  Singh, M., & Narwal, M. (2017). Measurement of Overall Equipment Effectiveness (OEE) of a manufacturing industry: An effective lean tool. International journal of recent trends in engineering and research3(5), 268-275.
[16]  Foulloy, L., Clivillé, V., & Berrah, L. (2019). A fuzzy temporal approach to the Overall Equipment Effectiveness measurement. Computers & industrial engineering127, 103-115.
[17]  Folmer, J., Schrüfer, C., Fuchs, J., Vermum, C., & Vogel-Heuser, B. (2016, July). Data-driven valve diagnosis to increase the overall equipment effectiveness in process industry. 2016 IEEE 14th international conference on industrial informatics (INDIN) (pp. 1082-1087). IEEE.
[18]  Ngadiman, Y., Hussin, B., Hamid, N. A., Ramlan, R., & Boon, L. K. (2016). Relationship between human errors in maintenance and overall equipment effectiveness in food industries. Proc. Int. Conf. on industrial engineering and operations management (pp. 2211-2224).
[19]  Hooi, L. W., & Leong, T. Y. (2017). Total productive maintenance and manufacturing performance improvement. Journal of quality in maintenance engineering23(1), 2-21.
[20]  Sethia, C. S., Shende, P. N., & Dange, S. S. (2014). Total productive maintenance-a systematic review. International journal for scientific research & development (8), 124-127.
[21]  Zulkafli, N. I., & Mat Dan, R. (2016). Investigation of maintenance performance for a gasification process unit using Weibull analysis. Journal of quality in maintenance engineering22(3), 252-263.
[22]  Sharma, A. K., & Shudhanshu, A. B. (2012). Manufacturing performance and evolution of TPM. International journal of engineering science and technology4(03), 854-866.
[23]  Nakajima, S. (1988). Introduction to TPM: total productive maintenance.(Translation). Productivity Press, Inc., 1988,, 129.
[24]  Ahuja, I. P. S., & Khamba, J. S. (2008). Total productive maintenance: literature review and directions. International Journal of quality & reliability management25(7), 709-756.
[25]  Ahuja, I. P. S., & Khamba, J. S. (2008). Total productive maintenance: literature review and directions. International journal of quality & reliability management25(7), 709-756.
[26]  Piechnicki, A. S., Sola, A. V. H., & Trojan, F. (2015). Decision-making towards achieving world-class total productive maintenance. International journal of operations & production management35(12), 1594-1621.
[27]  Ahmad, N., Hossen, J., & Ali, S. M. (2018). Improvement of overall equipment efficiency of ring frame through total productive maintenance: a textile case. The international journal of advanced manufacturing technology94(1-4), 239-256.
[28]  Dawood, L. M., & Abdullah, Z. H. (2018). Study Impact of Overall Equipment and Resource Effectiveness onto Cement Industry. Journal of university of babylon for engineering sciences26(3), 18 Peng, K. (2016). Equipment management in the post-maintenance era: a new alternative to total productive maintenance (TPM). Productivity Press.
[30]  Nurprihatin, F., Octa, A., Regina, T., Wijaya, T., Luin, J., & Tannady, H. (2019). The extension analysis of natural gas network location-routing design through the feasibility study. Journal of applied research on industrial engineering6(2), 108-124.
[31]  Tannady, H., Erlyana, Y., & Nurprihatin, F. (2019). Effects of Work Environment and Self-Efficacy toward Motivation of Workers in Creative Sector in Province of Jakarta, Indonesia. Calitatea20(172), 165-168.
[32] Nurprihatin, F., & Tannady, H. (2018). An integrated transportation models and savings algorithm to minimize distribution costs. Proceedingof the 1st Asia pacific conference in industrial and systems engineering.